How to use this checklist

Walk the site with it at dusk before the first overnight shift, then again at each phase change: after the slab, after dry-in, when the mechanical rough-in and the copper arrive, when the appliances and fixtures go in. Price Protection’s supervisor walks the same items with the superintendent before writing the post orders. Tick what is in place; what is not becomes the plan.

Perimeter and lighting

  • Fence continuous, panels clamped, no gaps at corners or where utilities enter
  • Fence set back from parked trailers and stacked material that could be used to climb it
  • Vehicle gate lockable, with the officer holding a key
  • Pedestrian gates closed and locked outside working hours
  • Lighting on the fence line, the gate, the laydown area and the trailers, on timers or sensors
  • Dark corners and blind spots noted for the patrol route
  • Site signage: no trespassing, cameras in use where true, contact number

Access control

  • One vehicle entry in use during working hours, staffed or watched
  • Sign-in list for workers, subcontractors, deliveries and visitors, with time in and out
  • Badge or hard-hat sticker system where the contractor uses one
  • Deliveries outside working hours refused unless authorized in advance
  • Keys, gate codes and the trailer alarm code held by named people only

Material and equipment

  • Copper, wire, tools and fixtures in locked containers away from the fence
  • Appliances delivered as late in the schedule as possible and locked up on arrival
  • Fuel tanks locked and lit
  • Equipment parked nose-in, keys removed, cabs locked, immobilized where possible
  • Serial numbers recorded for equipment and tools
  • Trailers locked and alarmed

Coverage

  • Overnight coverage decided: fixed post, patrol or both
  • Weekend and holiday coverage decided
  • Post orders written from the walk: route, checkpoints, gate rules, contacts
  • Superintendent’s after-hours number and the police non-emergency number on the post orders
  • Dispatch and supervisor numbers posted at the gate

Fire watch

  • Hot work permit system in place, with a permit authorizing individual named
  • Fire watch assigned for every hot work session and the post-work period
  • Fire watch scheduled for any period the building’s temporary or permanent systems are out of service
  • Extinguishers on every floor and at the hot work location, inspected

Reporting

  • Daily activity report to the superintendent each morning
  • Incident reports with photographs the same day
  • Monthly review of the post orders as the phase changes

Notes on filling it in

The items that prevent the most loss are the least glamorous: a continuous fence, a lit gate, copper in a locked container away from the fence. Coverage starts before the first high-value delivery, not after the first theft. The post orders change with the phase; a route written for a slab does not fit a building with four floors and a roof. The preparing a site article explains each step, and the hot work checklist covers the watch in detail.

Step by step

  1. Walk the perimeter

    Walk the whole fence line at dusk. Note every gap, every unlit section and every place a truck can back up to the fence. Fix the gaps and add lighting before anything else.

  2. Control the gates

    One vehicle gate in use, locked outside working hours with a lock the officer holds the key to. Pedestrian gates closed. Everyone signs in and out against a list.

  3. Store what gets stolen

    Copper wire, tools, appliances and fuel go in locked containers away from the fence. Equipment is parked nose-in with keys removed and, where possible, immobilized.

  4. Cover the hours nobody is there

    Overnight, weekends and holidays are when sites are hit. Decide on a fixed post, a patrol or both, and write the post orders from the walk.

  5. Plan fire watch with the schedule

    Every hot work day needs a permit and a watch, and a building whose temporary systems are down needs one until they are restored. Put both on the schedule.

  6. Set the reporting

    The superintendent gets a daily report: who came and went, what was checked, what was found. Incidents get their own report with photographs the same day.

Questions

Using this checklist.

When does a site need overnight security?

Once there is something worth stealing on it: from the first delivery of copper, appliances or equipment through to the last weeks before turnover, when the fixtures are in. Weekends and holidays first.

Fixed post or patrol?

A fixed post at the gate for a site with one way in and high-value material; a patrol for a large or linear site; both for a site that has been hit. The walk-through decides.

Who signs in visitors?

The gate officer, against the contractor's list, with time in and out, company and purpose. Deliveries outside working hours are refused unless the superintendent has authorized them in advance.

Does the fire watch officer also patrol?

No. A fire watch officer has no other duty during the watch. A site that needs both needs two officers.

Request a proposal

Request a proposal for your property.

Two short steps. Dispatch reviews every request and calls you back about coverage. For urgent unarmed coverage we can typically staff most sites within hours.

24-hour dispatch

(281) 326-9189

Headquarters

77 Sugar Creek Center Boulevard, Suite 600, Sugar Land, Texas 77478

Directions

Email

Info@price-protection.com

TX DPS Lic #B09430601

Step 1 of 2

Contact details

So dispatch can call you back about coverage.

Used to prepare your proposal and for nothing else. Urgent? Call dispatch any time.

Request a proposal

Tell us about the property.

Or call dispatch, 24 hours: (281) 326-9189

Step 1 of 2

Contact details

So dispatch can call you back about coverage.

Used to prepare your proposal and for nothing else. Urgent? Call dispatch any time.