Free checklist
Enterprise Security RFP Checklist
What to put in an RFP for continuous, multi-post or multi-site guard coverage, from scope by post and hours to the verification steps before signing.
By Price Protection SecurityReviewed TX DPS Lic #B09430601

How to use this checklist
This checklist is for a facility director, corporate security manager or procurement lead writing a request for proposal for guard coverage that runs continuously, across several posts, or across several sites. Work through the sections in order and tick each item as it is written into the RFP document. The result is a request that every bidder answers the same way, which is what makes the answers comparable. For a single community or office building with one or two posts, the shorter property manager RFP template is the better starting point; this checklist adds the items that continuous, multi-post and multi-site coverage bring with them.
A. Scope
- Each site named with its address and a site contact
- Each post listed: location, duties, armed or unarmed
- Weekly hours per post, written as days and times
- Shift pattern per post, or a statement that the bidder proposes one
- Peak-hour second posts listed separately with their windows
- Vehicle requirement per post, if any
- Start date and contract term
- Expected changes during the term (a construction phase, a new building, seasonal peaks)
The 24/7 staffing worksheet produces this section’s figures.
B. Procedures the vendor must follow
- Badge and access system the officers will use, and who provisions their credentials
- Visitor procedure, including identification, logging and badge issue
- Escort rules: who escorts whom, where, and what the officer does when an escort is absent
- Delivery and contractor procedure, by work order or appointment
- Challenge procedure for an unidentified person
- Prohibited items and no-photography rules
- Alarm and fire response steps, and the control room the officer reports to
- A statement that the vendor’s post orders will reproduce these procedures in the facility’s wording
C. Reporting and performance measures
| Requirement | Format or measure | Frequency |
|---|---|---|
| Daily report per post | Fields specified by the facility | Every shift |
| Incident report | Separate form, photographs where allowed | Same shift |
| Monthly summary | Fill rate, supervisor visits, incidents, training status | Monthly |
| Review meeting | Account lead present | Cadence set by the facility |
- Fill rate defined as post hours staffed against post hours scheduled
- Open post hours reported the same day with the reason
- Report delivery channel and storage specified
D. Transition
- Site survey date before post orders are drafted
- Post orders approved by the facility before the first shift
- Site training completed and acknowledged per officer before the first shift
- Badge issue and access list update sequence
- Post-by-post relief of the incumbent with no uncovered interval
- Vendor manager on site through the first week
E. Licensing, registration and insurance
- Texas DPS security company license number provided and verified by the facility
- DPS registration confirmed for each officer before assignment
- License level per post (Level II non-commissioned for unarmed, Level III commissioned for armed)
- Certificates of insurance issued to the facility’s organization, with the coverages the facility’s own risk team specifies
- W-9 and vendor onboarding forms
F. Supervision and account management
- Named account lead and escalation path
- Site supervisor post, if required, listed in section A with hours
- Roving supervisor visits across day, evening, night and weekend shifts
- 24-hour dispatch desk reachable by the post and the facility
- Daily documented performance review of assigned officers
G. Training and vetting
- Vendor’s screening steps beyond the DPS background check
- Facility’s right to approve or decline each assigned officer
- Site-specific training content and duration
- Acknowledgment form filed with the facility’s security team
- Rule that untrained officers do not work the post, including as relief
H. Confidentiality
- Company-level NDA attached for signature
- Officer-level confidentiality and no-photography acknowledgment
- Handling of access lists, camera views and visitor names
- Return of badges and removal from access lists on officer departure
I. Pricing structure
- Hourly rate per post, armed and unarmed stated separately
- Holiday dates named and premium stated
- Vehicle and supervisor post priced as their own lines
- Confirmation that relief, post orders, daily reports and supervision are inside the rate
- Billing period and the daily reports as the reconciliation record
J. References and verification
- References at facilities with controlled access and continuous posts
- License verified at the Texas DPS lookup
- Officer registrations checked for the proposed rota
- Certificates of insurance received and reviewed before signing
- Sample daily report, incident report and post orders reviewed
Notes on filling it in
Sections A and B carry the most weight and are the ones most often left thin. A bidder cannot price a post it cannot see, and cannot promise to follow a procedure it has not read. Section C is where the contract’s performance language comes from, and the KPI and SLA article explains how each measure is defined so the monthly summary means something. Section D is the one to insist on in writing, because the days between signature and first shift are when a facility is most exposed. For a data center the vendor requirements article expands every section above into the specific questions to ask. Price Protection answers each of these items in its proposals and expects to be asked.
Step by step
Define the scope post by post
List every post with its location, duties, weekly hours, shift pattern and armed or unarmed status, so bidders price the same thing and the rota can be checked against it.
Attach the access procedures the vendor must follow
Include the badge, visitor, escort, delivery and challenge procedures in your own wording, and require the bidder to confirm its post orders will reproduce them exactly.
State reporting and KPI expectations
Specify the daily report format, incident report timing, the monthly summary and the measures you will track, including fill rate and supervisor visits, with no vendor-set targets substituted for yours.
Require a written transition plan
Ask for the sequence from signature to first shift: survey, post orders, officer training, badge issue, post-by-post relief of the incumbent, and who is on site through the first week.
Set licensing and insurance certificate requirements
Require the Texas DPS company license number, officer registration confirmation per assigned officer and certificates of insurance issued to your organization, and verify each before signing.
Describe the supervision you expect
State whether you want a site supervisor post, roving supervisors across all shifts, or both, and require the schedule of supervisory visits to be reported monthly.
Specify training before the first shift
Require site-specific training on your systems and procedures with a signed acknowledgment per officer, and bar untrained officers from the post, including as relief.
Include confidentiality terms
Attach the NDA the vendor signs and the confidentiality and no-photography acknowledgment each officer signs, and state how reports and logs are transmitted and stored.
Set the pricing structure by hour and post
Ask for an hourly rate per post, with holiday dates and premiums named, so weekly and annual figures follow from the hours and can be reconciled to daily reports.
Ask for references and run the verification steps
Request references at facilities with controlled access and continuous posts, then verify the license, the registrations and the certificates yourself before signing.
Questions
Using this checklist.
How is this different from the property manager RFP template?
The property manager template is built for one community or building with one or two posts. This checklist covers continuous coverage, several posts, several sites, audit evidence and vendor transition, which are the parts an enterprise procurement process asks about.
Should price be the first thing scored?
Score the written answers to the scope, procedure, staffing and supervision items first, then open the pricing. A low hourly rate on a rota that cannot cover 168 hours a week is not low once open post hours and retraining are counted.
Do I need to tell bidders our access procedures before signing?
Enough of them for the bidder to price the training and write draft post orders. Sensitive detail can be shared under NDA with shortlisted bidders only, and the full procedures are read into the post orders once the contract is signed.
What should a bidder's staffing plan show for one continuous post?
A named rota with more than four officers trained for the site, the relief pool behind them, the shift pattern and handover times, and how open hours are reported. A plan that lists three names for a post that never closes is incomplete.
Related pages
Insights
Answers
Glossary
Request a proposal
Request a proposal for your property.
Two short steps. Dispatch reviews every request and calls you back about coverage. For urgent unarmed coverage we can typically staff most sites within hours.
24-hour dispatch
(281) 326-9189